Tomorrow is pre-drywall walkthrough. It may be a bit premature, as we don't even have the attic bathtub in place. Today, insulation was put in place. Still some areas missing it.
We also have our cable jacks wired.
Insulation in the master bedroom.
The electricity is now attached to the boxes.
More insulation...
Insulation in the garage.
But not in the third stall. :(
No comments:
Post a Comment